
|
|
||
|
|
|

Listed below are a few of the different waste water ponds that Gladen Construction has work on:
1.) City of Badger: Replacing structures, piping, and rip rap.
2.) CrowWing Landfill: New Leach ate pond construction.3.) City of Greenbush: Replacing structures, concrete piping, and 3269 liner feet of 6" forcemain from the existing lift station to the new inlet manhole for the waste ponds.
4.) Pine Ridge Waste Water Treatment Facility
5.) Red Lake Lagoon Ponds
6.) Northwood Lagoons, Northwood ND